Recent Projects

[General Civil] Sedona Odor Control Project - Senoda, Arizona - $130,000

Sedona Odor Control Project

Sedona Odor Control Project

City of Sedona

   
Project Name: Sedona Odor Control Project
Owner: City of Sedona
Client: City of Sedona
Completion Date: Scheduled November 2008
Contract Size: $130,000
Engineer: Woodson Engineering Inc
   
Project Description:

As the prime contractor, KEAR is constructing odor control improvements along HWY 89A in the City of Sedona. Currently the existing sewer system is venting directly into the atmosphere, resulting in odor disturbances to local residences. This project involves the installation of a new soil bed odor control system which is designed to eliminate these odors. KEAR is the prime contractor on this project and is working in conjunction with Bohn Biofilter to install this odor control system, water supply piping, and foul air HDPE piping. The project is scheduled for completion in mid November 2008.

[General Civil] Lake Mary WTP Chlorine Dioxide Facility - Flagstaff, Arizona - $569,000

Lake Mary Water Treatment Plant

Lake Mary Water Treatment Plant

Lake Mary Water Treatment Plant

   
Project Name: Lake Mary Water Treatment Plant
Chlorine Dioxide Facility
Owner: City of Flagstaff
Client: City of Flagstaff
Completion Date: August 2008
Contract Size: $569,000
Engineer: Malcolm Pirnie
   
Project Description:

As the prime contractor, KEAR is constructing a new chlorine dioxide facility for the City of Flagstaff at the Lake Mary Water Treatment Plant. The new masonry building addition will house a new chlorine dioxide system for treatment of raw water from Lake Mary. The project includes the building addition, all chlorine equipment, electrical upgrades, instrumentation and control upgrades, asphalt paving, two injection vaults, and 2000 lf of 4” HDPE pipe. The project was completed both on schedule and under the City of Flagstaff's budget.

[General Civil] Rainbow Valley 5MG Reservoir - Goodyear, Arizona - $3.1 Million

Rainbow Valley Reservoir & Pump Station

Rainbow Valley Reservoir & Pump Station

Rainbow Valley Reservoir & Pump Station

   
Project Name: RAINBOW VALLEY  5MG
  RESERVOIR & PUMP STATION
Owner: CITY OF GOODYEAR, ARIZONA
Client: MA Mortenson
Completion Date: June 2008
Contract Size: $3.1 Million
Engineer: Burgess & Niple
   
Project Description:

As a subcontractor for MA Mortenson, KEAR is providing complete mechanical construction services for the 5MG reservoir and pump station in Goodyear, Arizona. This project includes the installation, startup and testing of a new vertical turbine pump station and all related suction and discharge piping. Also included in the contract is installation and startup of a chlorination facility and site storm drain work. This project was completed in early June 2008.

  Mortenson ConstructionGoodyear Arizona
[General Civil] Desert Broom Park - Phoenix, Arizona - $3.0 Million

Desert Broom Park

Desert Broom Park

Desert Broom Park

   
Project Name: DESERT BROOM PARK
Owner: CITY OF PHOENIX
Completion Date: March 2008
Contract Size: $3.0 Million
Engineer: Olsson & Associates
   
Project Description:

KEAR provided complete CM@Risk services for the construction of the new park at Tatum and Cave Creek Roads.

This project consists of the complete construction of a new park at Tatum and Cave Creek Roads in Phoenix, AZ. The main focal point of the park is two new open space turf areas (soccer fields). Supporting elements for the soccer field are also included in the new construction. This included a soccer field lighting, a paved entry, eighty-space parking lot with lighting, pedestrian walkways, landscaping, and Ramadas with associated lighting. The project also included a rest room with associated water, sewer, electrical, lighting, and water fountain.

  City of Phoenix
[General Civil] CAP - Pilot Monorail Trash Rake - Buckeye, Arizona - $2.0 Million

Hassayampa Pilot Monorail

Hassayampa Pilot Monorail

Hassayampa Pilot Monorail

   
Project Name: HASSAYAMPA PILOT MONORAIL
  TRASH RAKE
Owner: CENTRAL ARIZONA PROJECT
Completion Date: November 2007
Contract Size: $2.0 Million
Engineer: CAP, KPFF ENGINEERS, ELMCO
   
Project Description:

This project consisted of the complete engineering, design, and construction of a new monorail trash raking and removal system for the Hassayampa Pumping Plant. The existing raking system was removed, and a new monorail system was designed and installed. In conjunction with CAP, KEAR coordinated the structural, mechanical and electrical design for this project, and executed the complete construction of the new monorail structural concrete caissons, foundations, structural steel, electrical, I &C, and startup/testing services.
Systems: Brackett Green Monorail Trash Rake, Eimco Water Technologies (parent company)

  Central Arizona Project
[General Civil] Sedona Wastewater Reclamation Plant Upgrades - Sedona, Arizona - $2,180,800

Sedona Wastewater Reclamation

Sedona Wastewater Reclamation

Sedona Wastewater Reclamation

   
Project Name: SEDONA WASTEWATER RECLAMATION
  PLANT UPGRADES
Owner: CITY OF SEDONA, ARIZONA
Client: City of Sedona
Completion Date: October 2007
Contract Size: $2,180,800
Architect: CH2MHill - Tempe, Arizona
   
Project Description:

This project consisted of miscellaneous upgrades to the existing wastewater reclamation facility in the City of Sedona. The existing aeration system was upgraded and expanded to handle increased flows, including new aeration system, FRP baffles, new mixers, and new return pumps. The existing solids handling building received a new centrifuge and related piping and controls, along with sludge grinder replacement and a new polymer feed system. KEAR installed a new reuse vertical turbine pump and related yard piping to allow for increased options for plant reuse water discharge. The plant SCADA system was also upgraded to handle all new equipment and increased plant processes.

  City of Sedona
[General Civil] CAP - Dual Waterlines to Headquarters - Phoenix, Arizona - $1.4 Million
   
Project Name: DUAL WATERLINES TO HEADQUARTERS
Owner: CENTRAL ARIZONA PROJECT
Completion Date: January 2007
Contract: $1.4 Million
Engineer: CSA ENGINEERING
   
Project Description:

This project consisted of the complete installation of over 13,000 linear feet of 4” and 12,000 lineal feet of 16” PVC waterline along the Central Arizona Project Canal. The water-line was constructed from the existing City of Phoenix Tramanto Pump station, extending along the CAP canal, across Happy Valley Road, and terminating at the Central Arizona Project corporate headquarters. KEAR provided complete pipeline excavation, bedding, installation, backfill and testing services resulting in a safe installation within the owner’s contract requirements.

Dual Waterlines To Headquarters

Central Arizona Project

[General Civil] ISB Cooling Tower Relocation - Tempe, Arizona - $1.4 Million

ISB Cooling Tower Relocation

ISB Cooling Tower Relocation

ISB Cooling Tower Relocation

   
Project Name: ISB COOLING TOWER RELOCATION
Owner: SRP - SALT RIVER PROJECT
Completion Date: March 2006
Contract: $1.4 Million
Engineer: KPFF Engineers, DHMW
   
Project Description:

This project consisted of the removal and disposal of two 150 Ton chillers from the roof of the SRP Information Services Building, and replacing them with two new ground-level 150 Ton Chillers. Along with the rigging and removal of the existing chillers, KEAR constructed a new cast-in-place chiller enclosure structure, chiller support foundations, chilled water piping, and all electrical and I&C systems. The chiller re-placement was completed with only a 4 hour downtime to the entire Information Services Building HVAC system.
Systems: Marley Cooling Towers

  Salt River Project
[General Civil] HDPE Pipe Construction - Springerville, Arizona - $610,000

Springerville HDPE Project

Springerville HDPE Project

Springerville HDPE Project

Compass Environmental Inc.

   
Project Name: SPRINGERVILLE HDPE PROJECT
Prime Contractor: COMPASS ENVIRONMENTAL, INC.
Owner: TUCSON ELECTRIC & POWER
Completion Date: July 2005
Contract: $610,000
Engineer: CH2M HILL
   
Project Description:

This project consisted of 1,450 lineal feet of 20” & 36” HDPE pipe for a new reuse pump station and reservoir facility . The fusion welded HDPE pipe and fittings were installed to transport reuse water for the Springerville Generating Station and reuse ponds. KEAR’s services included excavation, backfill, pipe installation and testing. KEAR worked closely with Compass environmental and CH2MHill resulting in a safe and complete installation within the owner’s schedule requirements.

  Springerville HDPE Project
[General Civil] Mulberry WWTP Upgrade - Phase 1 - Lake Havasu City, Arizona $7.0 Million
   
Project Name: MULBERRY & ISLAND WWTP
Owner: LAKE HAVASU CITY, ARIZONA
Completion Date: April 2005
Contract: $7.0 Million
Engineer: BURNS & McDONNELL ENGINEERING
   
Project Description:

The Mulberry and Island WWTP upgrade project involved the expansion of the existing Mulberry WWTP from 1.1 mgd to 2.2 mgd, and aeration upgrades to the existing Island WWTP. To achieve the Mulberry expansion a new clarifier, aeration basin, filtration system, UV disinfection system, blowers, odor control system, and I&C/electrical systems were constructed. As the general contractor, KEAR self performed all structural concrete, process piping, equipment installation, and startup activities while coordinat-ing the subcontracted electrical, masonry and I&C. The end result was a safe and complete plant expansion within the owner’s construction schedule requirements.
Installed Systems: Fairbanks-Morse VT Pumps, Schreiber-Aeration, Schreiber Clarifier, Allen Bradley Electrical, Wonder-ware, Pratt Valves, Trojan UV Disinfection, Cutler Hammer Switchgear, Met-Pro/Duall Odor Control System.

Mulberry & Island WWTP - Lake Havasu City

Mulberry & Island WWTP - Lake Havasu City

Mulberry & Island WWTP - Lake Havasu City

Lake Havasu City Arizona

[General Civil] Chlorine Containment PH. IIIB - Phoenix, Arizona - $4.5 Million

Chlorine Containment Phase IIIB

Chlorine Containment Phase IIIB

Chlorine Containment Phase IIIB

Chlorine Containment Phase IIIB

   
Project Name: CHLORINE CONTAINMENT, PHASE IIIB
Owner: CITY OF PHOENIX, ARIZONA
Completion Date: February 2005
Contract Size: $4.5 Million
Engineer: DAMON S. WILLIAMS ASSOCIATES, LLC
Sites Worked: Hatcher Reservoir • Horse Reservoir • Tapestry Canyon Reservoir • North Mountian Park Reservoir • Upper Mineral Road Reservoir • Lower Mineral Road Reservoir • Mountian Park Ranch Reservoir • Greenway Reservoir • Deem Hills Reservoir • 42nd Place Reservoir
   
Project Description:

Project consisted of removal of existing chlorine gas systems and construction of new sodium-hypochlorite injection systems at 10 remote facilities, including booster pump stations, wells, reservoirs, and PRV’s. KEAR installed 10 new chlorine containment masonry buildings, including cast–in-place concrete foundations, sumps, and roof. Multiple phases took place simultaneously at all locations.
Systems: Severn Trent Services/ Clor Tec- Sodium-Hypochlorite Generating System, Rosemount Analytical Analyzers, Square D Electrical Equipment.

  City of Phoenix
[General Civil] West San-Tan Lift Station - Gilbert, Arizona - $2.7 Million

West San Tan Lift Station

West San Tan Lift Station

Gilbert Arizona

   
Project Name: WEST SAN TAN LIFT STATION
Owner: CITY OF GILBERT, ARIZONA
Completion Date: January 2004
Contract Size: $2.7 Million
Engineer: Vanir Engineering
   
Project Description:

Construction of a new sanitary lift station with peak flow of 6 MGD, and 12,500 LF of 14” and 18” parallel DIP force main. Work included excavation, backfill, cast-in-place concrete, pumps, odor control, piping and equipment, electrical and I&C components and facility startup.

  West San Tan Lift Station
[Grading • Paving • Underground] Maverick Masonry Corporate Office Building - El Mirage, Arizona - $290,000

Maverick Masonry Corporate Office Building

Maverick Masonry Corporate Office Building

The Tieman Corporation

   
Project Name: MAVERICK MASONRY CORPORATE OFFICE BUILDING
Owner: RGT Tieman Northern LLC
Client: The Tieman Corp, Inc.
Completion Date: Scheduled May 2009
Contract Size: $290,000
Engineer: Cottrell Engineering Corp - Civil
   
Project Description:

The Tieman Corporation has subcontracted KEAR to provide grading, paving and underground utility construction services for the new Maverick Masonry Office building in El Mirage, AZ. KEAR is installing all domestic water, fire, storm drain, and sewer utilities, along with all site earthwork and grading, including site clearing, grading, excavation of the building basement, and removal of 2,500 cubic yards of spoils. KEAR is also
providing sub-grade prep for the new paver driveway and parking lot, along with over 25,000 square feet of asphalt pavement.

[Grading • Paving • Underground] Chandler Alternative School - Chandler, Arizona - $360,000

Chandler Alternative School

Chandler Alternative School

Concord General Contracting

   
Project Name: CHANDLER ALTERNATIVE SCHOOL
Owner: Chandler Unified School District
Client: Concord General Contracting
Completion Date: Scheduled November 2008
Contract Size: $360,000
Engineer: Hubbard Engineering (Civil) & NTD Architecture
   
Project Description:

Concord General Contracting has subcontracted KEAR for
the on and off-site grading and paving services for a new
25,554 SF Alternative School in Chandler, AZ. KEAR is
providing site development services including demolition,
clearing/grubbing, mass earthwork, off-site improvements to Cooper and Frye Road, building sub-grade prep, on-site retention excavation, and installation of an asphalt fire loop and parking lot. KEAR is scheduled to complete the site-work in November of 2009.

[Grading • Paving • Underground] Arizona Federal Credit Union - Phoenix, Arizona - $360,000

Building Committee, Inc

 

   
Project Name: AZ FEDERAL CREDIT UNION - Washington Branch
Owner: Arizona Federal Credit Union
Client: Building Committee, Inc (BCI)
Completion Date: March 2009
Contract Size: $360,000
Engineer: Woods– Associates, Inc
   
Project Description:

BCI has subcontracted KEAR for the on and off-site grading, paving and utility construction services for a new Arizona Federal Credit Union on 44th St and Van Buren in Phoenix, AZ. KEAR is providing site development services including clearing/grubbing, mass earthwork, off-site improvements to Van Buren, off-site utility tie-in’s, building sub-grade prep, on-site retention excavation, and drywell installation. KEAR’s underground utility package includes all water, storm, sewer, fire and pneumatic bank teller system trenching.

[Grading • Paving • Underground] Walgreens at Casa Grande Plaza - Casa Grande, Arizona - $1,000,000
   
Project Name: WALGREENS AT CASA GRANDE PLAZA
Owner: Steve Johnson Development
Client: Wilger Enterprises
Completion Date: Scheduled September 2008
Contract Size: $1,000,000
Engineer: KPFF Engineers and George Rainhart
   
Project Description:

KCC is performing 7.5 acres grading and site-work including 2700lf of fireline, 3000lf of 72” CMP, and 70,000sf of paving and base for a new Walgreens and two retail shops in Casa Grande, Arizona. KEAR is performing the work as a subcontractor to Wilger Enterprises.

Walgreens at Casa Grande Plaza

Walgreens at Casa Grande Plaza

Walgreens at Casa Grande Plaza

[Grading • Paving • Underground] Glendale Spring Training Facility - Glendale, Arizona - $600,000

Glendale Spring Training Facility

Glendale Spring Training Facility

   
Project Name: GLENDALE SPRING TRAINING FACILITY
Owner: LA Dodgers & Chicago White Sox
Client: MA Mortenson
Completion Date: January 2009
Contract Size: $600,000
Engineer: HKS
   
Project Description:

KEAR is providing structural excavation and backfill services for the new Glendale spring training facility located at 107th Avenue and Camelback. The new facility is the future home of the Chicago White Sox and LA Dodgers, and is slated for completion in early 2009.

[Grading • Paving • Underground] Western Valley Childcare - Surprise, Arizona - $600,000

Smith Construction Services

 

 

   
Project Name: WESTERN VALLEY CHILDCARE
Client: Smith Construction Services
Completion Date: April 2008
Contract Size: $ 600,000
Engineer: Hess Rountree
   
Project Description:

KEAR has been subcontracted by Smith Construction Services to provide mass grading and underground utility construction for the new Western Valley Childcare facility in Surprise, Arizona. KEAR’s subcontract consists of approximately 6 acres of grading, 3,800 lf of fireline, 1,130 lf of sewer line, and 600 lf of storm lines.

[Grading • Paving • Underground] Gas Sleeve - Reems & Waddell - Surprise, Arizona - $25,000

Gas Sleeve Project - Reems and Waddell

Gas Sleeve Project - Reems and Waddell

Southwest Gas Corporation

   
Project Name: GAS SLEEVE PROJECT - REEMS AND WADDELL
Client: CAP II
Completion Date: September 2007
Contract Size: $25,000
Engineer: SOUTHWEST GAS
   
Project Description:

KEAR was subcontracted by CAP II to install a new gas line sleeve for southwest gas. The project consisted of 300+ lf of asphalt sawcut, removal, sleeve installation, and patch.

[Grading • Paving • Underground] Goodyear Community Park I - Goodyear, Arizona - $850,000
   
Project Name: GOODYEAR COMMUNITY PARK PHASE I
Owner: CITY OF GOODYEAR
Client: NORQUAY CONSTRUCTION
Completion Date: January 2008
Contract: $850,000
Architect: URS
   
Project Description:

KEAR has been subcontracted by Norquay Construction Inc. to provide mass grading and underground utility construction for the new City of Goodyear community park. KEAR’s sub-contract consists of approximately 17 acres of grading, 2,500lf of fireline, and 3,000lf of sewer line.

  Norquay Construction Inc.Goodyear Arizona

Goodyear Community Park Phase I

Goodyear Community Park Phase I

Goodyear Community Park Phase I

[Grading • Paving • Underground] Mesquite Elementary Phase II - Gilbert, Arizona - $500,000
   
Project Name: MESQUITE ELEMENTARY
Owner: CITY OF GILBERT
Client: GILBERT UNIFIED SCHOOL DISTRICT
Completion Date: April 2007
Contract: $500,000
Engineer: H.D.A. Architects
   
Project Description:

For the second phase classroom expansion of the Mesquite Elementary school, KEAR provided site grading, paving and underground utility construction services. This project in-cluded 2,000lf of wet utilities, 3,900 cy of import, 4,200 cy of export, and 35,000sf of asphalt paving.

Mesquite Elementary Phase II

Mesquite Elementary Phase II

City of Gilbert Arizona

[Grading • Paving • Underground] Copper State Bank - Peoria, Arizona - $150,000
   
Project Name: COPPER STAR BANK
Owner: COPPER STAR BANK
Client: KEEGAN BUILDERS
Completion Date: April 2007
Contract: $150,000
Engineer: BCA Engineering
   
Project Description:

KEAR was subcontracted by Keegan Builders to provide underground utility construction for the new Copper Star Bank in Peoria, Arizona. KEAR’s subcontract consisted of the complete installation and testing of all underground wet utilities, both on and offsite.

Copper Star Bank

Copper State Bank

Copper Star Bank

[Grading • Paving • Underground] M&I Bank - Mesa, Arizona - $130,000
   
Project Name: M&I BANK
Owner: M&I BANK
Client: KEEGAN BUILDERS
Completion Date: January 2006
Contract: $130,000
Engineer: BCA Engineering
   
Project Description:

KEAR was subcontracted by Keegan Builders to provide mass grading and underground utility construction for the new M&I Bank in Mesa, Arizona. KEAR’s subcontract consisted of the complete existing site demolition, installation and testing of all underground wet utilities, both on and offsite.

M&I Bank

[Grading • Paving • Underground] Walgreens #9057 - Phoenix, Arizona - $250,000
   
Project Name: WALGREENS #9057
Owner: WALGREENS INC.
Client: WILGER ENTERPRISES
Completion Date: July 2005
Contract: $250,000
Architect: Broadbent & Associates
   
Project Description:

KEAR provided onsite earthwork construction services for the new Walgreens store at Union Hills and 19th Ave in North Phoenix. KEAR’s scope of work included all site demo and clearing, mass grading, pad prep, and asphalt paving.

  Walgreens Wilger Enterprises

Walgreens #9057

Walgreens #9057

Walgreens #9057

[Grading • Paving • Underground] Apache Campus Parking Lot - Scottsdale, Arizona - $130,000
   
Project Name: APACHE CAMPUS PARKING LOT
Owner: SCOTTSDALE UNIFIED SCHOOL DISTRICT
Completion Date: September 2005
Contract: $130,000
Engineer: Hess-Roundtree
   
Project Description:

KEAR completed the installation of a 50,000 SF parking lot for the Scottsdale Unified School District. This project included complete site construction services including clear/grub, storm-drain/retention, sub-grade prep, asphalt placement, finishes and striping.

Apache Campus Parking Lot

Apache Campus Parking Lot

Scottsdale Unified School District

[Fuel] Pressure Relief Bypass-8" - Sky Harbor Fuel Tank Farm

Pressure Relief Bypass-8"

Pressure Relief Bypass-8"

Pressure Relief Bypass-8"

   
Project Name: PRESSURE RELIEF BYPASS-8"
   
Owner: ARIZONA FUELING FACILITIES CORP.
Client: SWISSPORT FUELING
Completion Date: March 2008
   
Project Description:

KEAR is providing installation of a new 8" bypass at the Phoenix Sky Harbor International Airport Tank Farm. This project involves the substantial drain-down of the existing fuel distribution system, removal of the 4" bypass, and installation of the new 8" bypass and valve. The project was completed in late March 2008.

  Swissport
[Fuel] 30 MBL Tank Addition - Phoenix, Arizona - $500,000

Sky Harbor International Airport Tank Addition

Sky Harbor International Airport Tank Addition

Swissport

Pond

   
Project Name: PHOENIX 30 MBL TANK ADDITION
  SKY HARBOR INTERNATIONAL AIRPORT
Owner: ARIZONA FUELING FACILITIES CORP.
Client: POND CONSTRUCTORS
  SWISSPORT FUELING
Completion Date: February 2008
Contract Size: $500,000
Engineer: POND Constructors
   
Project Description:

As a subcontractor for POND Constructors, KEAR is providing complete mechanical construction services for the 30MBL Tank construction project. This project involves the new construction of an above ground fuel storage tank and all associated piping. KEAR is subcontracted to provide, install and test all fuel, fireline, and storm-drain piping for this new tank addition. KEAR is also providing all hot-tap and live fuel line tie-in’s to make the tank active upon completion. The project was completed in February 2008.

[Fuel] 12 inch Gasket Replacement - Sky Harbor International Airport

Swissport

 

 

 

 

   
Project Name: 12" ISO GASKET REPLACEMENT
   
Owner: ARIZONA FUELING FACILITIES CORP.
Client: SWISSPORT FUELING
Completion Date: March 2007
   
Project Description:

This project involved the upgrading of the gaskets on existing 12" Isolation Valves at several locations throughout terminal 4 South. KEAR provided all drain-down, old gasket removal, and replacement of new isolation kits and bolts. All ISO Valve Vaults were thoroughly cleaned and the existing piping coating was removed and prepped for new coating application.

[Fuel] 24 inch Valve Removal - 55th Ave Remote Tank Farm

24" Valve Removal

Swissport

   
Project Name: 24" VALVE REMOVAL & SPOOL INSTALL
Owner: ARIZONA FUELING FACILITIES CORP.
Client: SWISSPORT FUELING/KIEWIT
   
Completion Date: January 2007
   
Project Description:

This project involved the drain down of approximately 20,000 gallons of Jet fuel to facilitate the removal of an existing 24" valve. The 24" valve was removed and replaced with a prefabricated and tested spool. All cathodic protection was installed and tested for conformance. This project carried significant importance as the work was completed on the main 24" receiving line form Kinder Morgan, which supplies all fuel to the AFFC tank farm at 55th Avenue.

[Fuel] Terminal 2 Fuel Line Removal - Sky Harbor International Airport

Swissport

   
Project Name: T-2 FUEL LINE REMOVAL
Owner: ARIZONA FUELING FACILITIES CORP.
Client: SWISSPORT FUELING/KIEWIT
   
Completion Date: August 2006
   
Project Description:

Kear provided complete removal and capping of the existing fuel hydrant system on both the east and west sides of terminal 2 at Phoenix Sky Harbor Airport. The removal of the line was necessary for the new construction of Taxiway D, which was being relocated by Kiewit Western. KEAR completed the drain-down, flushing, capping, installation of new high-point risers, inspection pits, and all concrete restoration within the tight schedule requirements set forth by Kiewit Western.

[Fuel] 20" Transmission Main - T3-T2 - Sky Harbor Airport - Phoenix, Arizona - $1.9 Million

Sky Harbor International Airport Transmission Main

Sky Harbor International Airport Transmission Main

Sky Harbor International Airport Transmission Main

Swissport

Stantec

   
Project Name: 20" TRANSMISSION MAIN T-2 TO T-3
  SKY HARBOR INTERNATIONAL AIRPORT
Owner: ARIZONA FUELING FACILITIES CORP.
Client: SWISSPORT FUELING
Completion Date: April 2006
Contract Size: $1.9 Million
Engineer: Argus Consulting (Design)
  Stantec (Const. Mgr.)
   
Project Description:

KEAR Civil Corporation provided complete installation, testing and flushing services for the installation of over 2,600 LF of 20” fuel pipeline at Phoenix Sky Harbor International Airport. The pipeline was constructed by KEAR for Swissport Fueling, to allow for a complete fuel loop between the existing Terminal 2 and Terminal 3 gates. The project also consisted of the construction of two new isolation valve pits for the future airport expansion, and one new isolation valve pit for fuel flow control. The pipeline was constructed adjacent to active taxi-ways, under traffic control utilities and involved the jack-and-bore of the 20” pipeline under two active taxiways. KEAR successfully completed the 20” project with minimal impact to the fast track taxiway construction being performed by Kiewit Western.

[Fuel] Fuel System Maintenance & Repairs - Various Locations & Clients

Various Fuel Projects

Varioius Fuel Projects

Various Fuel Projects

Varioius Fuel Projects

   
Project Name: FUEL SYSTEM MAINTENANCE
   
Owner: VARIES
Client: VARIES
   
Project Description:

KEAR has provided a wide range of fuel maintenance and repair services. From massive drain-down and line repair, to simple bolt replacement, KEAR has performed these services to complete customer satisfaction. Valve replacement, hot-taps, line stopples, stopple bypasses, tank floor repairs, tank hot-taps, excavation, grading, concrete, asphalt repair, corrosion control, investigative digs, hydrant pit installations and contaminated soil removal are a few of the fuel system services we have provided to satisfied clients.

Various Fuel ProjectsVarious Fuel ProjectsVarious Fuel Projects
[DRY UTILITIES] Paradise Valley Fire Station No. 2 - Paradise Valley, Arizona
   
Project Name: Paradise Valley Fire Station No. 2
Owner: Town of Paradise Valley
Client: Spectra Electrical Services/TSG Constructors LLC
Completion Date: November 2008
Engineer: Arizona Public Service
   
Project Description:

Spectra Electrical Services subcontracted KEAR to provide primary power installation services for the new Fire Station No.2 in Paradise Valley. The project included the installation of primary power duct-bank across Lincoln Drive extending onsite to the new Fire Station building. KEAR provided all excavation, barricading, spoils removal, conduit installation, concrete, backfill, and asphalt replacement services. The project was executed with close coordination with APS and in accordance with their construction standards and requirements. The project was completed within the general contractor’s schedule requirements with minimal impact to surrounding business and residences.

Paradise Valley Fire Station No. 2

Paradise Valley Fire Station No. 2

Spectra Electrical