This project included the repair and upgrades to the existing water system and booster stations at Camp Pendleton. Included were the complete replacement of two booster pump stations, building upgrades, demolition of an existing redwood water storage tank, and new electrical and controls upgrades for both sites. The project also corrected erosion control and sediment buildup issues by extending an existing retaining wall and adding drainage with ditches, curbs, catch basins, riprap and new paved site access driveway.