City of Flagstaff, AZ-Continental Well jOC

Project Owner
City of Flagstaff
Project Location
Flagstaff, AZ
Project Delivery Method
JOC
Project Details
As part of KEAR’s JOC with the City of Flagstaff for Water Facility Construction, this project involved the construction of a 21,000-gallon water storage tank, demolition
and replacement of pipe, pumps, and equipment inside the existing pump house, distribution piping, retaining wall construction, and paving replacement.