MEM Fuel Farm Renovation & Upgrades

Project Location

Memphis International Airport, TN

Project Owner

Delta Airlines

Project Details

KEAR is providing prime contractor construction services on the Memphis International Airport Fuel Farm Renovation & Upgrade project. The project involves upgrading the existing facility through phased construction to maintain fueling operations at all times. KEAR is upgrading the existing 5,000 barrel Tank #3, along with all mechanical and electrical modifications necessary to connect Tank 3 to the operating system. Along with the actual tank work, secondary containment upgrades for the tank storage area are also being installed. The entire tank farm piping system is being upgraded to allow for periodic integrity testing of the below-grade piping, including new valves and piping systems. Spill containment upgrades are being completed to both the truck loading and off-loading areas as well as the hydrant pump and hydrant cart prover areas. The water removal systems (tanks and filter / separators) are being upgraded to recover clean fuel back into the system, along with a new petroleum contact water treatment system & existing tank drainage system retrofit. The project also features various site upgrades.

Project Images

Back to top