Nashville International Airport-Satellite Concourse Hydrant Fuel System

Project Owner
Metropolitan Nashville Airport Authority
Project Location
Nashville, Tennessee
Project Delivery Method
Design-Build
Project Details
KEAR was contracted by Holder Construction to construct the hydrant fuel system for the new 8-gate remote satellite concourse at Nashville International Airport. The project is phased to include the first phase of pipeline from the tank farm to the new terminal. The second phase is the construction of the system at the new terminal itself including all 8 hydrant pits, low points, high points and required flushing, testing and commissioning.