Project Owner

San Carlos Apache Tribe

Project Location

San Carlos, AZ

Project Delivery Method

Design-Bid-Build

Project Details

The project included installing a new fuel farm, including one 12,000-gallon UL2085 Fireguard Jet Fueling System and one 12,000-gallon UL2085 Fireguard Avgas Fueling system. KEAR installed the new systems on new concrete pads and installed all necessary pumps, valves, and electrical components. New primary power was installed from an offsite location.